Happy birthday to Michelle Z and Lee Ann!
I ran on Thursday this week, but didn't get a chance to log it because of the mad dash to get the basement ready for carpet installation on Friday. I ran while the kids were at swimming and had to force myself out there. I really wasn't up for it, so I decided to do 30 minutes easy and outside. I didn't realize it was incredibly windy and that half of the run would feel like running up a steep hill as I fought the wind. Yeah, I know, I'm a wimp. Anyway, on Thursday I put in 3.37 miles by running around the stadium 6 times. I ran the 5K distance with the miles at 10:22, 10:13, and 9:48 and finished the 5K in 31:21. Then I walked 5 minutes or so as a cool down.
Today I ran slower and longer. I put in 5.32 miles with the run 3 minutes and walk 1 minute pattern throughout, except for the last mile in which I walked more. My miles were 10:57, 11:06, 11:20, 11:15, and 11:42. My legs were pretty sore and my hips tight toward the end. I wore cushier shoes this time, though, so my feet didn't hurt.
As I was getting out of the shower after my run, I realized that I have to play 90 minutes of competitive volleyball tonight. And we've been playing a 5:1 (5 hitters and 1 setter) with me as the setter. So I'll be running like crazy all over the court. Oh well, I need the exercise.
So we did get the basement floor completed this week. We haven't gotten the furniture and such put back in place yet, though. Yesterday I was shopping for a big TV stand/console for a big screen TV we don't have yet. Ken is out researching the TVs today. We'll be getting surround sound and a blue ray and I don't know what all else, too. So it will take awhile to research before we pull the trigger. We did decide on the furniture piece though. Our TV stand/console should arrive in a couple of weeks. We bought it discounted at American Freight. I hope we can get all this stuff done before Thanksgiving. We expect company and it would be great to watch the football games on our new system in our almost-done basement.
Yes, I know, we've been working on the basement for years and years. Probably 13 years. It's getting close now. We just need trim/baseboards, some doors sanded, and finishing solutions for the stairs, stairway wall, and ceiling area there.
No comments:
Post a Comment